Commissioned by EMO, Van der Ende is working on the 2nd phase of the maintenance of the conservation system. In 4 weeks time we realize the complete touch up of the substructure of this impressive wheel excavator. A team of 8 gritblasters and painters will remove the corrosion from the substructure, after which the wheel excavator will be provided with a locally applied epoxy paint system.