For Taqa, Van der Ende performed the conservation work on a 48-meter-high flare in Bergen. With a team of five specialists and a safety consultant, the project was carried out in just five days. Thanks to thorough preparation, the flare was out of service for only 24 hours, keeping downtime to a minimum. A clever piece of work at height!

Conservation at level

Taqa means energy in Arabic. And energy gets Van der Ende from maintenance on the 48-meter flare in Bergen. A team of five specialists and a safety consultant performed the conservation work.

Thoroughly prepared

After thorough preparation, the job could be completed in 5 days. The flare was out of action for only 24 hours.

These techniques have been applied

Contact With Van der Ende

Curious about what we can do for you in the field of steel preservation?
If you have questions or need additional clarification, please fill out the form below and our specialists will respond promptly. For short questions, please call us at 010 – 472 11 88.
We will be happy to look at the possibilities for your business with you.

    My Industry:
    IndustryInfrastructureLogisticsMaritimeFoodOther

    Call me for an appointment