During most of the work, train traffic was able to use the railroad bridge as usual. For a small part of the work, including the construction of the scaffolding, the track’s out-of-service hours were used.

Rhine bridge renovation Oosterbeek
Eye for nature and environment
Commissioned by ProRail Infraprojecten Regio NoordOost, Van der Ende started blasting and preserving the Rijnbrug in Oosterbeek in March 2011. A steel railroad bridge consisting of a large main span and 7 abutments. Those ridges are located above the floodplain, which is designated as a nature reserve.
" " The work was performed by our own skilled personnel and with our own equipment to our complete satisfaction and in good cooperation and delivered on time."
Distinctive green color
The arch bridge and the lower parts of the abutments were completely blast cleaned to Sa 2.5. Here a thick old tar-like coating (Flintcote) was removed, which had been applied in layers as thick as 1 centimeter. The upper parts of the abutments were locally pretreated. The total was then given a new preservation system, in the characteristic green color.
These techniques have been applied
Contact With Van der Ende
Curious about what we can do for you in the field of steel preservation?
If you have questions or need additional clarification, please fill out the form below and our specialists will respond promptly. For short questions, please call us at 010 – 472 11 88.
We will be happy to look at the possibilities for your business with you.